设为首页 | 加入收藏    咨询热线:020-32201622  传真号码:020-32206671      最新产品honest|广告刊登|商务团队|联系我们 奥丽斯特
奥丽斯特燃气设备 燃气设备商城 燃气设备选型 燃气设备资料 工程技术咨询
最新秒杀产品 专业企业网站制作、优化、推广 一元广告区 最新电子商务咨询
  奥丽斯特首页 产品选型 燃气资讯 燃气展览 企业导航 工程案例 资料下载 广告服务 联系我们 关于奥丽斯特   LNG管道供气不促?
,日期:2024-11-23

位置:首页 > 燃气资讯 > NNPC, large-scale

NNPC, large-scale construction of gas pipeline

浏览次数 271 , 日期 2017-03-15 , 燃气设备 加入收藏

National petroleum corporation (NNPC) group general manager Maikanti Baru in 26th petroleum engineers society conference, to strengthen the national industrial gas supply and power stations, NNPC has completed 6 gas transmission pipeline project construction, there are two is under construction, and a 650 km Ajaokuta - Abuja - Kaduna - Kano pipeline project is bidding. 's natural gas reserves in the world, he said, the ninth, with rich oil and gas resources the ability to cope with the challenge of unemployment and infrastructure, but the Niger delta militants sabotage the oil and gas pipeline has been continued, the oil and gas industry often paralyzed, will affect the power supply. If the armed groups stop destroying, according to the current to power the gas supply situation of the industry, in the second quarter this year, power generation is expected to reach 4800-6000 megawatts.

打印  |  关闭
  图片新闻             更多..


  • 西藏昂仁县工商局

  • Iranian

  • Utrecht-

  • Light Du

  • Rock Reg

  • GasLiner

  最新资讯             更多..


 
注释:[1]本网站部分资料参照与来源于网络DMOZ中文网站分类目录-免费收录各类优秀网站的中文网站目录.版权声明:本站禁止任何形式的复制、盗8取本站设计样式与内容等.违者必究!网站法律顾问:ITLAW-庄毅雄律师
 
百度                                 
产品展示|国际品牌|企业导航|燃气信息|最新展会|商务团队|人才招聘|资料下载|广告服务|联系我们|关键字|友情连接|