设为首页 | 加入收藏    咨询热线:020-32201622  传真号码:020-32206671      最新产品honest|广告刊登|商务团队|联系我们 奥丽斯特
奥丽斯特燃气设备 燃气设备商城 燃气设备选型 燃气设备资料 工程技术咨询
最新秒杀产品 专业企业网站制作、优化、推广 一元广告区 最新电子商务咨询
  奥丽斯特首页 产品选型 燃气资讯 燃气展览 企业导航 工程案例 资料下载 广告服务 联系我们 关于奥丽斯特   LNG管道供气不促?
,日期:2024-11-23

位置:首页 > 燃气资讯 > Accelerating the e

Accelerating the east gas pipeline construction project between China and Russia

浏览次数 275 , 日期 2017-04-05 , 燃气设备 加入收藏

Since March 17, a large number of cross-border pipeline construction machinery and equipment and supplies to the heihe river freight port in heilongjiang province have closed region of exit to Russia. As of March 30, the heihe river freight port to the Russian side exit nearly 20 trains engineering equipment and supplies, value of 2.5775 million yuan. Mark the accelerating the east gas pipeline construction project between China and Russia.

Between China and the east gas pipeline project is to further strengthen energy cooperation between China and Russia, the important measures to comprehensively deepen strategic partnership, which is China's largest caliber and pressure of the highest long-distance natural gas pipeline projects. Natural gas pipeline from heihe city in China, through nine provinces, city, district, the end will arrive to Shanghai. Imported gas every year, and 38 billion cubic meters, to adjust and optimize the energy structure in our country, effectively ease the shortage of natural gas in northeast China, to improve the air pollution status of beijing-tianjin-hebei region, drive the local economic development is of great significance.



打印  |  关闭
  图片新闻             更多..


  • 西藏昂仁县工商局

  • Iranian

  • Utrecht-

  • Light Du

  • Rock Reg

  • GasLiner

  最新资讯             更多..


 
注释:[1]本网站部分资料参照与来源于网络DMOZ中文网站分类目录-免费收录各类优秀网站的中文网站目录.版权声明:本站禁止任何形式的复制、盗8取本站设计样式与内容等.违者必究!网站法律顾问:ITLAW-庄毅雄律师
 
百度                                 
产品展示|国际品牌|企业导航|燃气信息|最新展会|商务团队|人才招聘|资料下载|广告服务|联系我们|关键字|友情连接|