设为首页 | 加入收藏    咨询热线:020-32201622  传真号码:020-32206671      最新产品honest|广告刊登|商务团队|联系我们 奥丽斯特
奥丽斯特燃气设备 燃气设备商城 燃气设备选型 燃气设备资料 工程技术咨询
最新秒杀产品 专业企业网站制作、优化、推广 一元广告区 最新电子商务咨询
  奥丽斯特首页 产品选型 燃气资讯 燃气展览 企业导航 工程案例 资料下载 广告服务 联系我们 关于奥丽斯特   LNG管道供气不促?
,日期:2024-05-02

位置:首页 > 燃气资讯 > Oman don't object

Oman don't object to a longer deal production We will continue to increase supplies

浏览次数 167 , 日期 2017-04-07 , 燃气设备 加入收藏

           In February this year, world leaders made a special trip to anxin for field trips, and the planning and construction of male Ann district new city, including the construction of green wisdom makes the beautiful ecological environment, the seven key tasks. Less than 200 words in the task list, the \"green\" word in 4 times.

          Xiong county is the league, the ministry of land and resources of middlings was named \"the hometown of China hot spring\", is one of the areas with the most abundant geothermal resources in north China and even the whole country, bedrock hot geothermal storage area of 320 square kilometers, reserves of 82.178 billion cubic meters, the county a total of digging geothermal well 78 eyes, the recharge well 24 eyes, well water level observation 4 eyes, annual production of about 3.8 million cubic meters, recharge volume 2.5 million cubic meters, geothermal central heating area of 2.7 million square meters, accounting for 92% of the urban central heating area.

           First shares last April buy OTP, Indonesia SorikMarapi240MW geothermal field concession rights, disclosed three quarterly reports the project is well drilling, well, is expected to form installed size of 50 mw in the first half of 2017. In July last year to acquire 51% stake in Hungary Turawell geothermal companies, the existing three mouth geothermal Wells, with block potential geothermal resources about 70 mw, optimism is expected to issue 30 mw started in 2017 and will be completed. In August last year to buy SGI, Indonesia Sokoria30MW geothermal project development rights, the first geothermal power plant is estimated to be online in December 2018. The recent $149 million investment construction Indonesia Sokoria 30 mw geothermal power projects.

          Yantai moon, taking a stake in the company of yantai Ren libr absorption chiller, the original air conditioning production occupies 35% share of industrial waste heat utilization, ground source heat pump in shenyang share first. , yantai dunham-bush industry (the \"bird's nest\" of ground source heat pump system only trader) won the bid winning the guangzhou yuncheng water source heat pump systems engineering. The subsidiary Beijing huayuan Thai union manufacturing base in baoding city.



打印  |  关闭
  图片新闻             更多..


  • 西藏昂仁县工商局

  • Iranian

  • Utrecht-

  • Light Du

  • Rock Reg

  • GasLiner

  最新资讯             更多..


 
注释:[1]本网站部分资料参照与来源于网络DMOZ中文网站分类目录-免费收录各类优秀网站的中文网站目录.版权声明:本站禁止任何形式的复制、盗8取本站设计样式与内容等.违者必究!网站法律顾问:ITLAW-庄毅雄律师
 
百度                                 
产品展示|国际品牌|企业导航|燃气信息|最新展会|商务团队|人才招聘|资料下载|广告服务|联系我们|关键字|友情连接|