设为首页 | 加入收藏    咨询热线:020-32201622  传真号码:020-32206671      最新产品honest|广告刊登|商务团队|联系我们 奥丽斯特
奥丽斯特燃气设备 燃气设备商城 燃气设备选型 燃气设备资料 工程技术咨询
最新秒杀产品 专业企业网站制作、优化、推广 一元广告区 最新电子商务咨询
  奥丽斯特首页 产品选型 燃气资讯 燃气展览 企业导航 工程案例 资料下载 广告服务 联系我们 关于奥丽斯特   LNG管道供气不促?
,日期:2024-11-25

位置:首页 > 燃气资讯 > Kazakhstan cross-b

Kazakhstan cross-border liquefied petroleum gas pipeline construction project progress

浏览次数 387 , 日期 2017-04-28 , 燃气设备 加入收藏

        This year, the city of alyamaguchi will launch a 12-kilometer trans-border LPG pipeline that will be carried out in the area of the alyamaguchi area to the port of hastert. Horizon oil gas co., LTD., plans a total investment of 600 million yuan, 2017, a plan to invest 100 million yuan, the construction of cross-border LPG pipeline and supporting facilities, the design of 1 million tons of annual volume of traffic. At present, we have signed the inter-enterprise cooperation agreement with the haastin gas station, developed the project plan, and obtained the approval from the department of energy of the state of kazakhstan. Oil in the current design institute has to the horizon company site investigation, preparation of project feasibility study, strive for in the "area" summit, the national energy administration and the department of energy (doe) signed a cooperation agreement between the government. Company is working on the horizon project planning, evaluation, and the preliminary procedures, such as eia stockpile for existing loading and unloading station with rectification, preparatory work ahead for cross-border pipeline transport, strive for the project was finished before August, environmental assessment, land formalities, such as construction.

打印  |  关闭
  图片新闻             更多..


  • 西藏昂仁县工商局

  • Iranian

  • Utrecht-

  • Light Du

  • Rock Reg

  • GasLiner

  最新资讯             更多..


 
注释:[1]本网站部分资料参照与来源于网络DMOZ中文网站分类目录-免费收录各类优秀网站的中文网站目录.版权声明:本站禁止任何形式的复制、盗8取本站设计样式与内容等.违者必究!网站法律顾问:ITLAW-庄毅雄律师
 
百度                                 
产品展示|国际品牌|企业导航|燃气信息|最新展会|商务团队|人才招聘|资料下载|广告服务|联系我们|关键字|友情连接|